Specifications and performance for ORACLE Cloud - A4 8 vCPUs 32GB
This plan belongs to the ORACLE Cloud Ampere A4 server line (General Purpose).
Building on the strong foundation of our A1 and A2 generations, AmpereOne® M-powered A4 Standard instances deliver significantly higher performance, greater efficiency, and enhanced capabilities for today’s demanding workloads, including cloud-native applications, high-throughput services, and AI inferencing.
| Approximate Cost per vCPU | $12.92 |
| Approximate RAM per vCPU | 4GB |
| Hourly billing | yes |
| CPU type | ARM |
| Shared CPU | no |
| Storage included | no |
See also all ORACLE Cloud instance types.
| Provider | ORACLE Cloud |
|---|---|
| Plan URL | https://blogs.oracle.com/cloud-infrastructure/introducing-oci-ampere-a4-standard |
| Price per month | $105.35 |
| Discount or Surcharge for long or short term use |
No |
| Hourly Billing | Yes |
| Disk GB | 0 |
| Num Cores | 8 |
| Memory GB | 32 |
| Virtualization | KVM |
| Data Transfer GB | 0 |
| Burstable CPU | No |
| Dedicated CPU | No |
Badges are awards granted to VPS plans that meet certain quality criteria.
| Stable Performance | ORACLE Cloud - A4 8 vCPUs 32GB performance is very stable over long periods of time |
|---|
Grades are calculated by combining results from web, sysbench, endurance and remote timing tests. Grade A is best, grade F is worst. The grades below are those of the most recent trial run for this plan.
Follow the letter links to find the test results backing the grade.
More details about grades calculation
Overall Score: 56
We conducted 5 different types of tests during the latest trial for ORACLE Cloud - A4 8 vCPUs 32GB. Review the results and compare this plan to its competitors.
| Yabs | Web Runs | Network Transfers | Sysbench | Endurance |
|---|---|---|---|---|
| Review | Review | Review | Review | Review |
| Compare | Compare | Compare | Compare | Compare |
This plan was tested 1 times at vpsbenchmarks.com. The table below shows all trials run on the A4 8 vCPUs 32GB plan with its grade and CPU type.
| Start of Trial | CPU | Datacenter | Overall Grade |
|---|---|---|---|
| Jun 01 2026 | Ampere-1a | Virginia, USA | C |